|
|
| |
|
|
|
|
|
|
|
Actions
|
No
|
IDENTIFY
|
1753
|
|
A DCAF-TEST CP
|
S
|
Downstream
|
Excluding
|
Brownfield
|
Geology
Production Technology Reservoir Engineering Wells
Economics Exploration Evaluation Maritime Quality Engineering
|
|
|
No
|
IDENTIFY
|
1746
|
|
dWID
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geomatics Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Digital-Well-Identification-Document-(dWID).aspx
|
|
No
|
IDENTIFY
|
1745
|  |
Early Development Assessment
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Economics Exploration Evaluation Geomatics Project Engineering Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Notional-Field-Development-Plan.aspx
|
|
No
|
IDENTIFY
|
1481
|
|
Hc Production Forecast and Resource Volume Estimation
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Commercial
Exploration Evaluation Petrophysics / Geomechanics Production Technology
Cat Cracking Catalyst Safety
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Hc_Production_Forecast_and_Resource_Volume_Estimation_(DCAF_ID_1481,_24,_1482,_1483,_1484,_513).aspx
|
|
No
|
IDENTIFY
|
1696
|
|
Geodetic Reference Definition
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geomatics
Exploration Evaluation Geophysics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geodetic-Reference-Definition---XORP-2-(DCAF-ID-1696)-.aspx
|
|
No
|
IDENTIFY
|
1741
|  |
Integrated Subsurface Description
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Exploration Evaluation
Front-End Development Geology Geomatics Geophysics Petrophysics / Geomechanics Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Integrated-Subsurface-Narrative.aspx
|
|
No
|
IDENTIFY
|
93
|
|
Project Premises Document
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Exploration Evaluation
Front-End Development
|
https://ipms.shell.com/expected-practice-maps/identify/project-premises-document.html
|
|
No
|
IDENTIFY
|
1752
|
|
Project Premises Document - post discovery
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Exploration Evaluation
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Premises_Document_(DCAF_ID_93-_1361-_1476).aspx
|
|
No
|
IDENTIFY
|
1490
|
|
Resource Change Control Note (RCCN)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Exploration Evaluation Geology Petrophysics / Geomechanics
Economics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Resource_Change_Control_Note,_RCCN_(DCAF_ID_1490,_1491,_1492,_1493,_1494,_1495).aspx
|
|
No
|
ASSESS
|
23
|  |
Feasibility Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Geology Geomatics Geophysics Logistics Mechanical Engineering Petrophysics / Geomechanics Process Engineering Production Chemistry Production Operations Production Technology Project HSSE & SP Reservoir Engineering Wells
Contracting & Procurement Finance Projects Maritime Project Services
|
https://ipms.shell.com/expected-practice-maps/assess/feasibility-report.html
|
|
No
|
ASSESS
|
1526
|
|
Critical Rotating Equipment and Driver Type Selection Study
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Instrumentation, Control & Electrical
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Critical_Rotating_Equipment_and_Driver_Type_Selection_Study_(DCAF_ID_1526,_116).aspx
|
|
No
|
ASSESS
|
1742
|
|
Estimate & Schedule Basis Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Contracting & Procurement Project Engineering Project Services
|
https://eu001-sp.shell.com/:w:/r/sites/AAAAB2112/_layouts/15/Doc.aspx?sourcedoc=%7B7A40A333-5DA2-443F-B742-7B61E67B2ADE%7D&file=Estimate%20and%20Schedule%20Basis%20Report.docx&action=default&mobileredirect=true
|
|
No
|
ASSESS
|
127
|
|
Geotechnical and Metocean Data Acquisition Plan
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Front-End Development Geomatics Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Metocean_(and_Ice)_Data_Acquisition_Plan_and_Analysis_(DCAF_ID_127).aspx
|
|
No
|
ASSESS
|
24
|
|
Hc Production Forecast and Resource Volume Estimation
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Front-End Development Geology Petrophysics / Geomechanics Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Hc_Production_Forecast_and_Resource_Volume_Estimation_%28DCAF_ID_1481,_24,_1482,_1483,_1484,_513%29.aspx
|
|
No
|
ASSESS
|
33
|
|
Pipelines Flow and Flow Assurance Study - Preliminary
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Civil, Offshore & Pipelines Production Chemistry Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Pipelines_Flow_and_Flow_Assurance_Study_-_Preliminary_%28DCAF_ID_33%29.aspx
|
|
No
|
ASSESS
|
1354
|
|
Site Identification Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Geomatics Geophysics Maritime Project HSSE & SP Wells
Logistics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Site_Identification_Report_%28DCAF_ID_1354%29.aspx
|
|
No
|
ASSESS
|
656
|
|
Well Design Concept Options
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Geology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well-Design-Concept-Options-(DCAF-ID656).aspx
|
|
No
|
ASSESS
|
1747
|  |
Integrated Subsurface Description
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Front-End Development Geomatics Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Integrated-Subsurface-Narrative.aspx
|
|
No
|
ASSESS
|
1361
|
|
Project Premises Document
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
|
https://ipms.shell.com/expected-practice-maps/assess/project-premise-document.html
|
|
No
|
ASSESS
|
63
|
|
GHG (Greenhouse Gas) and Energy Management Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/GHG_%28Greenhouse_Gas%29_and_Energy_Efficiency_Report_%28DCAF_ID_63,_676,_251,_655,_677%29.aspx
|
|
No
|
ASSESS
|
1491
|
|
Resource Change Control Note (RCCN)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Petrophysics / Geomechanics
Economics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Resource_Change_Control_Note,_RCCN_%28DCAF_ID_1490,_1491,_1492,_1493,_1494,_1495%29.aspx
|
|
No
|
SELECT
|
1382
|  |
Basis for Design
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Civil, Offshore & Pipelines Geomatics Information Management Information Technology Instrumentation, Control & Electrical Logistics Maritime Mechanical Engineering Process Engineering Production Chemistry Production Operations Production Technology Project HSSE & SP Reservoir Engineering
Project Engineering
|
https://ipms.shell.com/expected-practice-maps/select/basis-for-design.html
|
|
No
|
SELECT
|
116
|
|
Critical Rotating Equipment and Driver Selection Study-update
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Instrumentation, Control & Electrical
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Critical_Rotating_Equipment_and_Driver_Type_Selection_Study_(DCAF_ID_1526,_116).aspx
|
|
No
|
SELECT
|
675
|
|
Electrical Load List
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Process Engineering
Information Technology Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Electrical-Load-List-(DCAF-ID-675,-278,-1249).aspx
|
|
No
|
SELECT
|
288
|
|
Enabling Infrastructure Works Assessment Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Front-End Development
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/infrastructure_requirements_(DCAF_ID_288).aspx
|
|
No
|
SELECT
|
1496
|
|
Equipment Sizing and Listing
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
Civil, Offshore & Pipelines Instrumentation, Control & Electrical
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Equipment_listing_%28DCAF_ID_1496,_1497,_1498%29.aspx
|
|
No
|
SELECT
|
1272
|
|
Fluid Risk Assessment and Chemical Requirements
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Chemistry
Civil, Offshore & Pipelines Front-End Development Petrophysics / Geomechanics Process Engineering Production Operations Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Chemicals_requirement_report_%28DCAF_ID_1272,_250,_1224%29.aspx
|
|
No
|
SELECT
|
108
|
|
Heat and Material Balance Report -Concepts
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Heat_and_Material_balance_report_%28DCAF_ID_108___420%29.aspx
|
|
No
|
SELECT
|
210
|
|
Initial Materials Selection Report (including Corrosion Mgt. Strategy)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Maintenance, Reliability & Turnarounds Process Engineering Production Chemistry Production Technology Wells
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Initial_Materials_Selection_Report,_including_Corrosion_Management_Strategy_(DCAF_ID_210).aspx
|
|
No
|
SELECT
|
324
|
|
Metocean and Geotech Site Data Reference Report
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Front-End Development Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Metocean_(and_Ice)_reference_document_(DCAF_ID_324).aspx
|
|
No
|
SELECT
|
124
|
|
Offshore Structure Weight Mgt. Estimate
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Offshore_structure_weight_management_estimate_(DCAF_ID_124___309).aspx
|
|
No
|
SELECT
|
1181
|
|
Operations and Maintenance Philosophy
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Front-End Development Maintenance, Reliability & Turnarounds Project HSSE & SP
Information Management Information Technology Logistics Mechanical Engineering Process Engineering
|
https://ipms.shell.com/expected-practice-maps/select/define-asset-owners-requirements.html
|
|
No
|
SELECT
|
113
|
|
PACO Strategy Reports
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Process Engineering Production Operations
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/paco_strategy.aspx
|
|
No
|
SELECT
|
110
|
|
Pipelines Flow and Flow Assurance Strategy Report(s)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Civil, Offshore & Pipelines Production Chemistry Production Operations Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Pipelines_Flow_and_Flow_Assurance_Strategy_Report(s)_(DCAF_ID_110).aspx
|
|
No
|
SELECT
|
112
|
|
Process Flow Diagram (PFD)
|
S
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Flow_Schemes_%28DCAF_ID_112,_242___1213%29.aspx
|
|
No
|
SELECT
|
118
|
|
Site Master Plan (onshore)/ Facilities layout (offshore)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Production Operations Project HSSE & SP
Logistics Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Facilities_layout_%28offshore%29_%28DCAF_ID_118,_289,_1220___1463%29.aspx
|
|
No
|
SELECT
|
89
|
|
Site Selection report (onshore/field architecture/offshore)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Civil, Offshore & Pipelines Geomatics Geophysics Production Operations Project HSSE & SP Wells
Logistics Project Engineering Quality Engineering
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
122
|
|
Subsea Control Systems Preliminary Design Package
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Production Operations
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/subsea_control_systems_-_dcaf.aspx
|
|
No
|
SELECT
|
119
|
|
Subsea Facilities Layout Design Basis
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Geomatics Instrumentation, Control & Electrical Project HSSE & SP Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Subsea_Facilities_Layout_Design_Basis_%28DCAF_ID_119___320%29.aspx
|
|
No
|
SELECT
|
1360
|
|
Utilities Process Flow Diagram (PFD)
|
S
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Utility_Flow_Schemes_%28UFS%29_%28DCAF_ID_1360,_1390___1435%29.aspx
|
|
No
|
SELECT
|
99
|  |
Concept Select Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Civil, Offshore & Pipelines Geology Logistics Maritime Mechanical Engineering Petrophysics / Geomechanics Process Engineering Production Chemistry Production Operations Production Technology Project HSSE & SP Project Services Reservoir Engineering Wells
Contracting & Procurement Project Engineering
|
https://ipms.shell.com/expected-practice-maps/select/concept-select-report.html
|
|
No
|
SELECT
|
1749
|
|
dWID
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Geology Geomatics Geophysics Petrophysics / Geomechanics Production Chemistry Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Digital-Well-Identification-Document-(dWID).aspx
|
|
No
|
SELECT
|
133
|  |
Field Development Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Geology Geomatics Geophysics Petrophysics / Geomechanics Process Engineering Production Chemistry Production Technology Project HSSE & SP Reservoir Engineering Wells
Economics Logistics Project Engineering
|
https://ipms.shell.com/expected-practice-maps/select/field-development-plan.html
|
|
No
|
SELECT
|
1329
|
|
Drilling Location Request (DLR)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geomatics
Geology Geophysics Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Drilling_Location_Request_%28DCAF_ID_1329%29.aspx
|
|
No
|
SELECT
|
1482
|
|
Hc Production Forecast and Resource Volume Estimation
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Front-End Development Geology Petrophysics / Geomechanics Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Hc_Production_Forecast_and_Resource_Volume_Estimation_%28DCAF_ID_1481,_24,_1482,_1483,_1484,_513%29.aspx
|
|
No
|
SELECT
|
1715
|
|
WRFM Plan (incl. IPSM)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Geophysics Instrumentation, Control & Electrical Petrophysics / Geomechanics Process Engineering Production Chemistry Production Operations Reservoir Engineering
Information Management Information Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/WRFM_Strategy___Plan_%28DCAF_ID_1170,_136,_336,_437___515%29_%28WRFM%29.aspx
|
|
No
|
SELECT
|
1748
|  |
Integrated Subsurface Description
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Front-End Development Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Integrated-Subsurface-Narrative.aspx
|
|
No
|
SELECT
|
1732
|
|
Production Promise
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Project Engineering Wells
Commercial Logistics Reservoir Engineering
|
https://ipms.shell.com/expected-practice-maps/select/production-promise.html
|
|
No
|
SELECT
|
138
|  |
Project Execution Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Production Operations Project HSSE & SP
Commercial Front-End Development Information Management Information Technology Project Services Quality Engineering
|
https://ipms.shell.com/expected-practice-maps/select/project-execution-strategy.html
|
|
No
|
SELECT
|
1378
|
|
Diving Requirements Evaluation Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Diving_Requirements_Evaluation_Report_%28DCAF_ID_1378%29.aspx
|
|
No
|
SELECT
|
1743
|
|
Estimate & Schedule Basis Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Project Services
|
https://eu001-sp.shell.com/:w:/r/sites/AAAAB2112/_layouts/15/Doc.aspx?sourcedoc=%7B7A40A333-5DA2-443F-B742-7B61E67B2ADE%7D&file=Estimate%20and%20Schedule%20Basis%20Report.docx&action=default&mobileredirect=true
|
|
No
|
SELECT
|
1476
|
|
Project Premises Document
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
|
https://ipms.shell.com/expected-practice-maps/assess/project-premise-document.html
|
|
No
|
SELECT
|
676
|
|
GHG (Greenhouse Gas) and Energy Management Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Front-End Development Mechanical Engineering Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/GHG_%28Greenhouse_Gas%29_and_Energy_Efficiency_Report_%28DCAF_ID_63,_676,_251,_655,_677%29.aspx
|
|
No
|
SELECT
|
1492
|
|
Resource Change Control Note (RCCN)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Petrophysics / Geomechanics
Economics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Resource_Change_Control_Note,_RCCN_%28DCAF_ID_1490,_1491,_1492,_1493,_1494,_1495%29.aspx
|
|
No
|
DEFINE
|
238
|  |
Basic Design and Engineering Package
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Civil, Offshore & Pipelines Information Management Information Technology Instrumentation, Control & Electrical Maintenance, Reliability & Turnarounds Mechanical Engineering Process Engineering Production Operations Production Technology Project HSSE & SP Quality Engineering Reservoir Engineering
Contracting & Procurement Maritime
|
https://ipms.shell.com/expected-practice-maps/define/basic-design-engineering-package.html
|
|
No
|
DEFINE
|
609
|
|
Asset Owner Readiness Execution Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Process Engineering Project HSSE & SP
Contracting & Procurement Information Management Production Technology
|
https://ipms.shell.com/expected-practice-maps/define/prepare-asset-owner-readiness.html
|
|
No
|
DEFINE
|
256
|
|
Automation Design Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Information Technology Production Operations Production Technology
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Automation_Design_Package_-_DCAF.aspx
|
|
No
|
DEFINE
|
250
|
|
Chemical Application Definition
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Chemistry
Petrophysics / Geomechanics Production Operations Production Technology Reservoir Engineering
Mechanical Engineering Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Fluid-Risk-Management-and-Chemical-Application-Definition-(DCAF-ID-250).aspx
|
|
No
|
DEFINE
|
278
|
|
Electrical Load List
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Information Technology Mechanical Engineering Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Electrical-Load-List-(DCAF-ID-675,-278,-1249).aspx
|
|
No
|
DEFINE
|
1722
|
|
Heat and Material Balance report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Heat_and_Material_balance_report_(DCAF_ID_108___420).aspx
|
|
No
|
DEFINE
|
1412
|
|
Heat Transfer Equipment Data Sheets and Specifications
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Utilities_and_Heat_Transfer_Equipment_Data_Sheets_and_Specifications_%28DCAF_ID_1412%29.aspx
|
|
No
|
DEFINE
|
409
|
|
Manage Equipment Care (MEC) Execution Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Production Operations
Civil, Offshore & Pipelines Information Management Instrumentation, Control & Electrical Maritime Mechanical Engineering Process Engineering Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Maintenance_and_Integrity_strategies_(DCAF_ID_409).aspx
|
|
No
|
DEFINE
|
297
|
|
Materials Selection Report -updated
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Process Engineering Production Chemistry Production Technology Wells
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Materials_Selection_Report_-_updated_(DCAF_ID_297).aspx
|
|
No
|
DEFINE
|
270
|
|
Mechanical Static Equipment Data Sheets and Specifications
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Civil, Offshore & Pipelines Instrumentation, Control & Electrical Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Mechanical_Static_Equipment_Data_Sheets_and_Specifications_(DCAF_ID_270).aspx
|
|
No
|
DEFINE
|
257
|
|
PACO Safeguarding (Alarm Management, Instrumented Protection Systems and Fire and Gas) Design Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Production Operations
Mechanical Engineering Process Engineering Project HSSE & SP
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/paco_safeguarding.aspx
|
|
No
|
DEFINE
|
1666
|
|
PCD IT Security Design - Controls Maturity and Compliance Assessment Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Instrumentation, Control & Electrical
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/PCD_IT_Security_Controls_Maturity___Compliance_Assessment_Report.aspx
|
|
No
|
DEFINE
|
384
|
|
Performance Standards and Assurance Tasks for Safety Critical Elements/Equipment
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Instrumentation, Control & Electrical Mechanical Engineering Process Engineering Production Technology Project HSSE & SP Quality Engineering
Civil, Offshore & Pipelines Information Technology Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Equipment_%28DCAF_ID_384,_452%29.aspx
|
|
No
|
DEFINE
|
248
|
|
Pipelines Flow and Flow Assurance Design and Operability Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Civil, Offshore & Pipelines Production Chemistry Production Operations Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Pipelines_Flow_and_Flow_Assurance_Design_and_Operability_Report_(DCAF_ID_248).aspx
|
|
No
|
DEFINE
|
243
|
|
Piping & Instrumentation Diagrams (P&IDs)
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Civil, Offshore & Pipelines Instrumentation, Control & Electrical Mechanical Engineering Production Chemistry Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/P_IDs%29_%28DCAF_ID_243,_1214,_1230%29.aspx
|
|
No
|
DEFINE
|
267
|
|
Plot plans/ Mechanical General Arrangement Drawings/ Facilities Layout (on and offshore)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Maintenance, Reliability & Turnarounds Process Engineering Project HSSE & SP
Civil, Offshore & Pipelines Information Technology Instrumentation, Control & Electrical Logistics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Facilities_layout_report_on___offshore_%28DCAF_ID_267,_1247,_1633%29.aspx
|
|
No
|
DEFINE
|
1720
|
|
Positive Vetting plan - Marine Asset
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maritime
Production Operations
|
|
|
No
|
DEFINE
|
667
|
|
Process Control Design Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Information Technology Mechanical Engineering Production Operations
Process Engineering
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/process_control_-_dcaf.aspx
|
|
No
|
DEFINE
|
242
|
|
Process Flow Diagram (PFD)
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Flow_Schemes_%28DCAF_ID_112,_242___1213%29.aspx
|
|
No
|
DEFINE
|
241
|
|
Process Safeguarding Flow Schemes (PSFS) and Memorandum
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Safeguarding_Flow_Schemes_%28PSFS%29_and_Memorandum_%28DCAF_ID_241,_1242,_1227%29.aspx
|
|
No
|
DEFINE
|
249
|
|
Relief, Flare and Vent Study Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Relief,_Flare_and_Vent_study_report_%28DCAF_ID_249,_1211___1229%29.aspx
|
|
No
|
DEFINE
|
275
|
|
Rotating Equipment Data Sheets and Specifications
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Instrumentation, Control & Electrical Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Rotating-Equipment-Type-Selection-Report,-Datasheets-and-Specifications-(DCAF-ID-273,-275).aspx
|
|
No
|
DEFINE
|
273
|
|
Rotating Equipment Type Selection Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Rotating-Equipment-Type-Selection-Report,-Datasheets-and-Specifications-(DCAF-ID-273,-275).aspx
|
|
No
|
DEFINE
|
607
|
|
Spare Parts Strategy including Capital Insurance Spares Study
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Instrumentation, Control & Electrical
Civil, Offshore & Pipelines Logistics Maritime Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Capital_Insurance_Spares_study_report_%28DCAF_ID_607%29.aspx
|
|
No
|
DEFINE
|
337
|
|
Strategic Asset Management Plan (Outline)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Reservoir Engineering
Information Management Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Asset_Reference_Plan_(DCAF_438).aspx
|
|
No
|
DEFINE
|
1640
|
|
Subsea Control Design Package
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Production Operations Wells
Civil, Offshore & Pipelines Contracting & Procurement Information Technology Production Technology Project Engineering Project HSSE & SP
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/subsea_control_systems_-_dcaf.aspx
|
|
No
|
DEFINE
|
320
|
|
Subsea Facilities Layout Design Basis
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Civil, Offshore & Pipelines
Geomatics Instrumentation, Control & Electrical Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Subsea_Facilities_Layout_Design_Basis_%28DCAF_ID_119___320%29.aspx
|
|
No
|
DEFINE
|
599
|
|
Technical Integrity Verification Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Maintenance, Reliability & Turnarounds Mechanical Engineering Quality Engineering
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1642
|
|
Telecoms Systems Design Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Instrumentation, Control & Electrical Production Operations
Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Telecommunication_Systems.aspx
|
|
No
|
DEFINE
|
1739
|
|
Utilities Equipment Data Sheets and Specifications
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Utilities_and_Heat_Transfer_Equipment_Data_Sheets_and_Specifications_%28DCAF_ID_1412%29.aspx
|
|
No
|
DEFINE
|
1391
|
|
Utilities Piping & Instrumentation Diagrams (P&IDs)
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/P_IDs%29_%28DCAF_ID_1391,_1449___1461%29.aspx
|
|
No
|
DEFINE
|
1390
|
|
Utilities Process Flow Diagram (PFD)
|
S
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Utility_Flow_Schemes_%28UFS%29_%28DCAF_ID_1360,_1390___1435%29.aspx
|
|
No
|
DEFINE
|
657
|
|
dWFS
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Geology Geomatics Geophysics Petrophysics / Geomechanics Production Chemistry Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well_Functional_Specification_%28DCAF_ID_657%29.aspx
|
|
No
|
DEFINE
|
1616
|  |
Early Works Readiness Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Process Engineering Project Services
|
https://ipms.shell.com/expected-practice-maps/define/early-works-readiness-report.html
|
|
No
|
DEFINE
|
1483
|
|
Hc Production Forecast and Resource Volume Estimation
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Petrophysics / Geomechanics Production Operations Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Hc_Production_Forecast_and_Resource_Volume_Estimation_%28DCAF_ID_1481,_24,_1482,_1483,_1484,_513%29.aspx
|
|
No
|
DEFINE
|
240
|
|
WRFM Plan (incl. IPSM)
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Instrumentation, Control & Electrical Petrophysics / Geomechanics Process Engineering Production Chemistry Production Operations Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/WRFM_Strategy___Plan_%28DCAF_ID_1170,_136,_336,_437___515%29_%28WRFM%29.aspx
|
|
No
|
DEFINE
|
1750
|  |
Integrated Subsurface Description
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Front-End Development Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Integrated-Subsurface-Narrative.aspx
|
|
No
|
DEFINE
|
1733
|
|
Production Promise
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Project Engineering Wells
Commercial Logistics Maintenance, Reliability & Turnarounds Reservoir Engineering
|
https://ipms.shell.com/expected-practice-maps/define/production-promise.html
|
|
No
|
DEFINE
|
470
|
|
Operations Organisational Resourcing, Training and Competence Assurance Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Maritime
Logistics
|
https://ipms.shell.com/expected-practice-maps/execute/prepare-asset-owners-organisation.html
|
|
No
|
DEFINE
|
338
|  |
Project Execution Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Information Management Information Technology Logistics Production Operations Project HSSE & SP Quality Engineering
Contracting & Procurement Project Services
|
https://ipms.shell.com/expected-practice-maps/define/project-execution-plan.html
|
|
No
|
DEFINE
|
1744
|
|
Estimate & Schedule Basis Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Project Services
|
https://eu001-sp.shell.com/:w:/r/sites/AAAAB2112/_layouts/15/Doc.aspx?sourcedoc=%7B7A40A333-5DA2-443F-B742-7B61E67B2ADE%7D&file=Estimate%20and%20Schedule%20Basis%20Report.docx&action=default&mobileredirect=true
|
|
No
|
DEFINE
|
1493
|
|
Resource Change Control Note (RCCN)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Petrophysics / Geomechanics
Economics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Resource_Change_Control_Note,_RCCN_%28DCAF_ID_1490,_1491,_1492,_1493,_1494,_1495%29.aspx
|
|
No
|
DEFINE
|
378
|  |
Sourcing Package(s)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Information Management Maintenance, Reliability & Turnarounds Production Operations Project HSSE & SP Quality Engineering
Project Services
|
https://ipms.shell.com/expected-practice-maps/define/sourcing-package.html
|
|
No
|
DEFINE
|
1394
|
|
Well Detailed Design
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Wells
Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well_Detailed_Design_(DCAF_ID_1394).aspx
|
|
No
|
DEFINE
|
1693
|
|
Well Test Proposal
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Production Chemistry Production Operations Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well-Test-Proposal-(DCAF-ID-1693).aspx
|
|
No
|
EXECUTE
|
1734
|  |
Approved for Construction Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Project Services Quality Engineering
|
https://ipms.shell.com/expected-practice-maps/execute/approved-for-construction-report.html
|
|
No
|
EXECUTE
|
474
|
|
Asset Owner Readiness Confirmed Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Maritime Production Technology Project HSSE & SP
Information Management Logistics Process Engineering
|
https://ipms.shell.com/project-standards/ps5/control-5e9.html
|
|
No
|
EXECUTE
|
1224
|
|
Chemical Selection (Procurement)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Chemistry
Petrophysics / Geomechanics Production Operations Production Technology Reservoir Engineering
Civil, Offshore & Pipelines Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Chemical-Selection-(Procurement)-(DCAF-ID-1224).aspx
|
|
No
|
EXECUTE
|
1194
|
|
Corrosion Management Framework and Inspection Plan
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Maintenance, Reliability & Turnarounds Production Chemistry
Civil, Offshore & Pipelines Information Management Process Engineering Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Corrosion_Management_Framework_%28DCAF_ID_300,_1194___1197%29.aspx
|
|
No
|
EXECUTE
|
1249
|
|
Electrical Load List
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Information Technology Mechanical Engineering Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Electrical-Load-List-(DCAF-ID-675,-278,-1249).aspx
|
|
No
|
EXECUTE
|
420
|
|
Heat and Material Balance Report -Final
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Heat_and_Material_balance_report_%28DCAF_ID_108___420%29.aspx
|
|
No
|
EXECUTE
|
648
|
|
Operations ALARP Demonstration Report (Operations HSSE Case)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Logistics Maritime Project HSSE & SP
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/EE_Backup/Pages/Operations_ALARP_Demonstration_Report_%28Operations_HSSE_Case%29_%28DCAF_648%29.aspx
|
|
No
|
EXECUTE
|
1247
|
|
Plot plans/ Mechanical General Arrangement Drawings/ Facilities Layout (on and offshore)
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Project HSSE & SP
Civil, Offshore & Pipelines Information Technology Instrumentation, Control & Electrical Logistics Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Facilities_layout_report_on___offshore_%28DCAF_ID_267,_1247,_1633%29.aspx
|
|
No
|
EXECUTE
|
1242
|
|
Process Safeguarding Flow Schemes (PSFS) and memorandum - Final
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering
Instrumentation, Control & Electrical Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Safeguarding_Flow_Schemes_(PSFS)_and_Memorandum_(DCAF_ID_241,_1242,_1227).aspx
|
|
No
|
EXECUTE
|
1211
|
|
Relief, Flare and Vent Final Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Mechanical Engineering Production Operations Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Relief,_Flare_and_Vent_study_report_%28DCAF_ID_249,_1211___1229%29.aspx
|
|
No
|
EXECUTE
|
488
|
|
Welding, Fabrication and Inspection Procedures
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Mechanical Engineering
Civil, Offshore & Pipelines Quality Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Welding,_Fabrication___Inspection_Procedures_%28DCAF_ID_488%29.aspx
|
|
No
|
EXECUTE
|
1245
|
|
Automation Detailed Design and Construction Package
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Information Technology
Process Engineering
|
http://sww.wiki.shell.com/wiki/index.php/Process_Automation_Systems_-_DCAF
|
|
No
|
EXECUTE
|
1209
|
|
PACO Safeguarding (Alarm Management, Instrumented Protection Systems and Fire and Gas) Detailed Design and Construction Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Mechanical Engineering Process Engineering Project HSSE & SP
|
http://sww.wiki.shell.com/wiki/index.php/Instrumented_Protection_Systems_and_Fire_%26_Gas
|
|
No
|
EXECUTE
|
1667
|
|
PCD IT Security Detailed Design - Controls Maturity and Compliance Assessm.Report
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Instrumentation, Control & Electrical
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/PCD_IT_Security_Controls_Maturity___Compliance_Assessment_Report.aspx
|
|
No
|
EXECUTE
|
683
|
|
Process Control Detailed Design and Construction Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Information Technology
Mechanical Engineering Process Engineering
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/process_control_-_dcaf.aspx
|
|
No
|
EXECUTE
|
1635
|
|
Subsea Control Systems Detailed Design and Construction Package
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Instrumentation, Control & Electrical
Civil, Offshore & Pipelines Information Technology Production Technology Project Engineering Project HSSE & SP
|
https://eu001-sp.shell.com/sites/aaaab1732/pages/subsea_control_systems_-_dcaf.aspx
|
|
No
|
EXECUTE
|
1636
|
|
Telecoms Systems Detailed Design and Construction Package
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Instrumentation, Control & Electrical Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Telecommunication_Systems.aspx
|
|
No
|
EXECUTE
|
431
|  |
Commissioning and Start-up Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Mechanical Engineering Process Engineering Project HSSE & SP
Civil, Offshore & Pipelines Instrumentation, Control & Electrical Maintenance, Reliability & Turnarounds Production Technology Project Engineering
|
https://ipms.shell.com/expected-practice-maps/execute/commissioning-and-start-up-plan.html
|
|
No
|
EXECUTE
|
1621
|  |
Construction Readiness Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Project HSSE & SP
Contracting & Procurement Logistics Project Services Quality Engineering
|
https://ipms.shell.com/expected-practice-maps/execute/construction-readiness-report.html
|
|
No
|
EXECUTE
|
1735
|  |
Contract Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Project HSSE & SP
Project Services
|
https://ipms.shell.com/expected-practice-maps/execute/contract-management-plan.html
|
|
No
|
EXECUTE
|
1484
|
|
Hc Production Forecast and Resource Volume Estimation
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Petrophysics / Geomechanics Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Hc_Production_Forecast_and_Resource_Volume_Estimation_%28DCAF_ID_1481,_24,_1482,_1483,_1484,_513%29.aspx
|
|
No
|
EXECUTE
|
1451
|
|
WRFM Plan (incl. IPSM)
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Process Engineering Production Chemistry Production Operations Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/WRFM_Strategy___Plan_%28DCAF_ID_1170,_136,_336,_437___515%29_%28WRFM%29.aspx
|
|
No
|
EXECUTE
|
1751
|  |
Integrated Subsurface Description
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Front-End Development Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Integrated-Subsurface-Narrative.aspx
|
|
No
|
EXECUTE
|
1214
|
|
Piping & Instrumentation Diagrams (P&IDs)
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering Production Chemistry Production Operations
Civil, Offshore & Pipelines
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/P_IDs%29_%28DCAF_ID_243,_1214,_1230%29.aspx
|
|
No
|
EXECUTE
|
1449
|
|
Utilities Piping & Instrumentation Diagrams (P&IDs)
|
NS
|
Downstream;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Instrumentation, Control & Electrical Mechanical Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/P_IDs%29_%28DCAF_ID_1391,_1449___1461%29.aspx
|
|
No
|
EXECUTE
|
1494
|
|
Resource Change Control Note (RCCN)
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Petrophysics / Geomechanics
Economics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Resource_Change_Control_Note,_RCCN_%28DCAF_ID_1490,_1491,_1492,_1493,_1494,_1495%29.aspx
|
|
No
|
EXECUTE
|
1284
|  |
Statement of Fitness
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Maintenance, Reliability & Turnarounds Production Operations Project HSSE & SP Wells
Quality Engineering
|
https://ipms.shell.com/expected-practice-maps/execute/statement-of-fitness.html
|
|
No
|
EXECUTE
|
438
|
|
Strategic Asset Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Geology Maintenance, Reliability & Turnarounds Production Technology Reservoir Engineering
Information Management
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Asset_Reference_Plan_(DCAF_438).aspx
|
|
No
|
EXECUTE
|
626
|
|
Technical Integrity Verification Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Maintenance, Reliability & Turnarounds Production Operations Quality Engineering
Process Engineering Production Technology Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Technical_Integrity_Verification_%28TIV%29_Plan_%28DCAF_ID_599;_DCAF_ID_626%29.aspx
|
|
No
|
EXECUTE
|
452
|
|
Equipment Care Plans
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Civil, Offshore & Pipelines Instrumentation, Control & Electrical Mechanical Engineering Process Engineering Production Technology Project HSSE & SP
Information Technology Maritime Quality Engineering
|
https://eu001-sp.shell.com/sites/AAFAA3720/SiteAssets/pdfjs/web/viewer.aspx?file=https://eu001-sp.shell.com/sites/AAAAB2112/NOVKnowledgeItems/MEC_RP05_Global%20Equipment%20Care%20Strategies.pdf
|
|
No
|
EXECUTE
|
1172
|
|
Well Handover Document
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Wells
Production Operations Production Technology
Civil, Offshore & Pipelines Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well_Handover_Document_%28DCAF_ID_1172%29.aspx
|
|
No
|
EXECUTE
|
375
|
|
Well Programme
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Wells
Geology Petrophysics / Geomechanics Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well_programme_%28DCAF_ID_375%29.aspx
|
|
No
|
EXECUTE
|
492
|
|
Well Unloading and Startup Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Production Chemistry Production Operations
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well_Unloading_Plan_%28DCAF_ID_492%29.aspx
|
|
No
|
IDENTIFY
|
1330
|
|
CAPEX Cost Estimate - Type 0
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
IDENTIFY
|
1705
|
|
Contingent Resource Initiation Note (CRIN)
|
NS
|
|
Excluding
|
Brownfield
|
Reservoir Engineering
Exploration Evaluation Front-End Development Geology Geophysics Petrophysics / Geomechanics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Contingent_Resource_Initiation_Note,_CRIN_(DCAF_ID_2).aspx
|
|
No
|
IDENTIFY
|
2
|
|
Contingent Resource Initiation Note 01
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Exploration Evaluation Front-End Development Geology Geophysics Petrophysics / Geomechanics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Contingent_Resource_Initiation_Note,_CRIN_(DCAF_ID_2).aspx
|
|
No
|
IDENTIFY
|
1737
|
|
De-Risking and Maturation Plan incl. EMV Tree
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Commercial Economics Front-End Development
|
|
|
No
|
IDENTIFY
|
1699
|
|
Depth and Fluid fill prognoses table (XORP4)
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geophysics Petrophysics / Geomechanics
|
|
|
No
|
IDENTIFY
|
1736
|
|
Development Assessment
|
NS
|
|
Excluding
|
Brownfield
|
Front-End Development
Exploration Evaluation Geology Production Technology Reservoir Engineering Wells
|
|
|
No
|
IDENTIFY
|
1529
|
|
Dynamic Modelling Report
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Exploration Evaluation Geology Geophysics Petrophysics / Geomechanics
Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Dynamic_Modelling_Report_(DCAF_ID_1529,_1527,_1530,_1531,_1532,_1533).aspx
|
|
No
|
IDENTIFY
|
1701
|
|
Emergency Response Data Set
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geomatics Geophysics Petrophysics / Geomechanics
Project HSSE & SP Wells
|
|
|
No
|
IDENTIFY
|
1672
|
|
End of Well Report
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geophysics Petrophysics / Geomechanics Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/End_of_Well_Report_(DCAF_ID_1558,_1559,_1560,_1561,1450,_227).aspx
|
|
No
|
IDENTIFY
|
1336
|
|
Estimate Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Front-End Development
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Estimate_basis_report_(DCAF_ID_1336,_1352,_1374,_1403___1419).aspx
|
|
No
|
IDENTIFY
|
1671
|
|
Exploration Well Functional Specification
|
NS
|
|
Excluding
|
Brownfield
|
Geomatics Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/---Well-Proposal.aspx
|
|
No
|
IDENTIFY
|
1702
|
|
Geohazard and Surface Location Assessment (XORP4)
|
NS
|
|
Excluding
|
Brownfield
|
Geophysics
Exploration Evaluation Geomatics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geohazard-Assessment.aspx
|
|
No
|
IDENTIFY
|
1676
|
|
Geophysical Project Execution and HSE Plan
|
NS
|
|
Excluding
|
Brownfield
|
Geophysics
Exploration Evaluation
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geophysical_Project_Execution_Plan_(DCAF_ID_11).aspx
|
|
No
|
IDENTIFY
|
1675
|
|
Geophysical Project Initiation Plan
|
NS
|
|
Excluding
|
Brownfield
|
Geophysics
Exploration Evaluation Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geophysical_Project_Initiation_Plan_(DACF_ID_10).aspx
|
|
No
|
IDENTIFY
|
1698
|
|
Geophysical Survey Design Report
|
NS
|
|
Excluding
|
Brownfield
|
Geophysics
Exploration Evaluation Geomatics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geophysical-Survey-Design-Report-.aspx
|
|
No
|
IDENTIFY
|
1674
|
|
Group Investment Proposal (for exploration well) (XORP 4)
|
NS
|
|
Excluding
|
Brownfield
|
Front-End Development Reservoir Engineering
Commercial Economics Project HSSE & SP Wells
|
http://sww.shell.com/ors
|
|
No
|
IDENTIFY
|
1704
|
|
H2S prediction report (XORP4)
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Production Technology Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/H2S-Prediction-DCAF-Control-Points.aspx
|
|
No
|
IDENTIFY
|
1604
|
|
HSSE and SP Hazards and Effects Register
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Front-End Development Production Operations
|
https://eu001-sp.shell.com/sites/AAAAA8434/S01/Web/ToolkitHome.aspx
|
|
No
|
IDENTIFY
|
1285
|
|
Impact Assessment (incl. GHG and EM)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
IDENTIFY
|
1477
|
|
In Place Volumetric Report
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Geophysics Petrophysics / Geomechanics Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/In_Place_Volumetric_Report_(DCAF_ID_1477,_1353,_231,_1478,_1479,_1480).aspx
|
|
No
|
IDENTIFY
|
1703
|
|
Logging Program proposal (XORP4)
|
NS
|
|
Excluding
|
Brownfield
|
Petrophysics / Geomechanics
Exploration Evaluation Geophysics
Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Logging-Program-Proposal-(XORP4).aspx
|
|
No
|
IDENTIFY
|
1549
|
|
Petrophysical Evaluation Model
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Petrophysics / Geomechanics
Exploration Evaluation Geology Geophysics Reservoir Engineering
Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Petrophysical_evaluation_model.aspx
|
|
No
|
IDENTIFY
|
1700
|
|
PPFG prognosis (XORP4)
|
NS
|
|
Excluding
|
Brownfield
|
Geophysics
Exploration Evaluation Petrophysics / Geomechanics Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Pore-Pressure-and-Frac-Gradient-Prognosis-%E2%80%93-Exploration-(DCAF-ID-1700).aspx
|
|
No
|
IDENTIFY
|
1697
|
|
Project HSSE and SP Activity Plan
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geophysics
Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAA8434/S01/Web/ToolkitHome.aspx
|
|
No
|
IDENTIFY
|
1277
|
|
Project HSSE and SP Activity Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Front-End Development
|
https://eu001-sp.shell.com/sites/AAAAA8434/S01/Web/ToolkitHome.aspx
|
|
No
|
IDENTIFY
|
1706
|
|
Project Premises Document (previous PIN in EP) (XORP 5)
|
NS
|
|
Excluding
|
Brownfield
|
Front-End Development
Commercial Economics
|
https://ipms.shell.com/
|
|
No
|
IDENTIFY
|
1648
|
|
Project Schedule - Level 1
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
IDENTIFY
|
1278
|
|
Risk Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project Services
|
https://ipms.shell.com/
|
|
No
|
IDENTIFY
|
1695
|
|
Risk Management Plan (XORP 1)
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Front-End Development Geophysics Wells
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
IDENTIFY
|
1673
|
|
Risked Volumetrics in BPA2
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geophysics Petrophysics / Geomechanics Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/In_Place_Volumetric_Report_(DCAF_ID_1477,_1353,_231,_1478,_1479,_1480).aspx
|
|
No
|
IDENTIFY
|
8
|
|
Stakeholder Engagement Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project HSSE & SP
|
https://eu015-sp.shell.com/sites/IPMS/default.aspx
|
|
No
|
IDENTIFY
|
1738
|
|
Tie-Back/Hook-up/Testing specific CPs
|
NS
|
|
Excluding
|
Brownfield
|
Front-End Development
Exploration Evaluation Geology Production Operations Production Technology Reservoir Engineering Wells
|
|
|
No
|
IDENTIFY
|
1740
|
|
Well Initiation Note
|
NS
|
|
Excluding
|
Brownfield
|
Exploration Evaluation
Geophysics Production Technology Reservoir Engineering Wells
|
|
|
No
|
IDENTIFY
|
1555
|
|
Well Initiation Note
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Geophysics Petrophysics / Geomechanics Production Technology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Well_Proposal_(DCAF_ID_1555,_1556,_1331,_1332,_1439,_1557).aspx
|
|
No
|
ASSESS
|
74
|
|
CAPEX Cost Estimate - Type 1
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
1527
|
|
Dynamic Modelling Report
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Reservoir Engineering
Geology Geophysics Petrophysics / Geomechanics
Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Dynamic_Modelling_Report_%28DCAF_ID_1529,_1527,_1530,_1531,_1532,_1533%29.aspx
|
|
No
|
ASSESS
|
1352
|
|
Estimate Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Front-End Development
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Estimate_basis_report_%28DCAF_ID_1336,_1352,_1374,_1403___1419%29.aspx
|
|
No
|
ASSESS
|
12
|
|
Geodetic Reference Definition
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geomatics
Geophysics Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geodetic_Reference_Definition_%28DCAF_ID_12%29.aspx
|
|
No
|
ASSESS
|
10
|
|
Geophysical Project Initiation Plan
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geophysics
Geology Geomatics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geophysical_Project_Initiation_Plan_(DACF_ID_10).aspx
|
|
No
|
ASSESS
|
1357
|
|
Group Investment Proposal
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Reservoir Engineering
Commercial Project Services
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
57
|
|
HSSE and SP Hazards and Effects Register
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Front-End Development Geophysics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/HSSE___SP_Hazards_and_Effects_Register_%28DCAF_ID_1604,_57,_213,_382,_628%29.aspx
|
|
No
|
ASSESS
|
172
|
|
Impact Assessment
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
1353
|
|
In Place Volumetric Report
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Geophysics Petrophysics / Geomechanics Reservoir Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/In_Place_Volumetric_Report_(DCAF_ID_1477,_1353,_231,_1478,_1479,_1480).aspx
|
|
No
|
ASSESS
|
50
|
|
Logistics and Infrastructure Resource Assessment (LIRA) report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Logistics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Logistics_Infrastructure_and_Resource_Assessment_Report_(DCAF_ID_50).aspx
|
|
No
|
ASSESS
|
1337
|
|
Opportunity Roadmap
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project Engineering
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
37
|
|
Project Execution Assessment
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project Engineering
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
55
|
|
Project HSSE and SP Activity Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Front-End Development
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_HSSE___SP_Activity_Plan_(DCAF_ID_1277,_55,_580,_586,_618).aspx
|
|
No
|
ASSESS
|
70
|
|
Project Schedule - Level 1
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
1669
|
|
Proposal to Commence Neg. (PCN)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Commercial
Front-End Development Reservoir Engineering
Economics
|
https://eu001-sp.shell.com/sites/AAAAA7019/default.aspx
|
|
No
|
ASSESS
|
84
|
|
Risk Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project Services
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
1626
|
|
Schedule Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Front-End Development
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
85
|
|
Stakeholder Engagement Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Production Operations Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
ASSESS
|
1556
|
|
Well Proposal
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Geomatics Geophysics Petrophysics / Geomechanics Production Chemistry Production Technology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/---Well-Proposal.aspx
|
|
No
|
ASSESS
|
1713
|
|
Fluid Risk Assessment and Chemical Requirements
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Chemistry
Petrophysics / Geomechanics Reservoir Engineering Wells
Civil, Offshore & Pipelines Geology Process Engineering Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Chemicals_requirement_report_%28DCAF_ID_1272,_250,_1224%29.aspx
|
|
No
|
ASSESS
|
1630
|
|
Geomechanical Risk Assessment
|
S
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Petrophysics / Geomechanics
Front-End Development Geology Geophysics Production Technology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Geomechanical_Risk_Assessment_%28DCAF_ID_1630%29.aspx
|
|
No
|
ASSESS
|
1712
|
|
Integrated Production System Model and WRFM plan (incl. SMART field screening)
|
S
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Technology
Petrophysics / Geomechanics Production Chemistry Reservoir Engineering
Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/WRFM_Strategy___Plan_%28DCAF_ID_1170,_136,_336,_437___515%29_%28WRFM%29.aspx
|
|
No
|
SELECT
|
191
|
|
CAPEX Cost Estimate - Type 2
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Front-End Development Production Operations Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1708
|
|
Chemicals Requirement Report - Preliminary
|
NS
|
Downstream
|
Excluding
|
Brownfield
|
Process Engineering
|
|
|
No
|
SELECT
|
166
|
|
Commissioning and Start-Up (CSU) Philosophy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Production Technology Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Commissioning_and_Start-Up_%28CSU%29_Philosophy_%28DCAF_166%29.aspx
|
|
No
|
SELECT
|
180
|
|
Concept ALARP Demonstration Report (Concept HSSE and SP case)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Front-End Development Process Engineering Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Concept___Design_ALARP_demonstration_report_%28HSSE__SP_Case%29_%28DCAF_ID_180,_383___639%29.aspx
|
|
No
|
SELECT
|
1380
|
|
Constructability Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Front-End Development Production Operations
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1505
|
|
Cost recovery framework
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Contracting & Procurement
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Cost_Recovery_Framework_%28DCAF_ID_1505,_1506,_1507%29.aspx
|
|
No
|
SELECT
|
1661
|
|
CP Execution Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Contracting & Procurement
Logistics Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/CP_Execution_Strategy_and_CPPM_%28Select_DCAF_ID_1661%29.aspx
|
|
No
|
SELECT
|
1372
|
|
Design Class Select
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Process Engineering
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1374
|
|
Estimate Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Front-End Development
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Estimate_basis_report_%28DCAF_ID_1336,_1352,_1374,_1403___1419%29.aspx
|
|
No
|
SELECT
|
600
|
|
Final CP Sourcing Strategy and Tactics Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Finance Projects
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1377
|
|
Flawless Project Delivery Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Quality Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Flawless_Project_Delivery_Plan_%28DCAF_ID_1377%29.aspx
|
|
No
|
SELECT
|
1383
|
|
Group Investment Proposal (or PCP)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Finance Projects Project Engineering Reservoir Engineering
Commercial Economics
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1724
|
|
Health Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Health_Plan_%28DCAF_ID_1603,_1607,_1610,_1386,_1624%29.aspx
|
|
No
|
SELECT
|
213
|
|
HSSE and SP Hazards and Effects Register
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/HSSE___SP_Hazards_and_Effects_Register_%28DCAF_ID_1604,_57,_213,_382,_628%29.aspx
|
|
No
|
SELECT
|
583
|
|
HSSE and SP Premises
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Production Operations Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1646
|
|
IM Scope of Work and Information Specification
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Management
Maintenance, Reliability & Turnarounds
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IM_Scope_of_Work_and_Information_Specification_%28DCAF_ID_Select__1646,_Define__1643,_Execute__1637%29.aspx
|
|
No
|
SELECT
|
1727
|
|
IM Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Management
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IM_strategy_(DCAF_ID_1473).aspx
|
|
No
|
SELECT
|
1290
|
|
Impact Assessment
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1193
|
|
Interface Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Contracting & Procurement Project HSSE & SP
Commercial Production Operations
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1647
|
|
IT Scope of Work
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IT_Scope_of_Work_(DCAF_ID_1647,_1644,_1638).aspx
|
|
No
|
SELECT
|
1472
|
|
IT Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Information Management Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IT_strategy_(DCAF_ID_1472).aspx
|
|
No
|
SELECT
|
1521
|
|
Level 3 Schedule for next phase
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project Services
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
220
|
|
Logistics and Infrastructure Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Logistics
Geomatics Wells
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Logistics_and_Infrastructure_Strategy_(DCAF_ID_220).aspx
|
|
No
|
SELECT
|
219
|
|
Operability and Maintainability Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operability_and_Maintainability_Report_(DCAF_219).aspx
|
|
No
|
SELECT
|
218
|
|
Operations and Maintenance Philosophy (including Organisation philosophy)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Logistics Maintenance, Reliability & Turnarounds Production Technology Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operations___Maintenance_Philosophy,_including_Organisation_Philosophy_(DCAF_ID_218)._SELECT_phase.aspx
|
|
No
|
SELECT
|
198
|
|
OPEX Estimate - Type 2
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Process Engineering Wells
Logistics Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/OPEX_Estimate_-_Type_2_%28DCAF_198%29.aspx
|
|
No
|
SELECT
|
185
|
|
Opportunity Roadmap
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project Engineering
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
216
|
|
Ops. Readiness Mgt. Plan (updated)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operations_Readiness_Management_Plan_%28DCAF_216%29._SELECT_phase.aspx
|
|
No
|
SELECT
|
1522
|
|
Pacesetter Benchmarking Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Front-End Development
Commercial Project Services
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1376
|
|
Preliminary Project Quality Plan (including audit schedule for project)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Quality Engineering
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Preliminary_Project_Quality_Plan,_Project_Quality_Plan_and_Final_Project_Quality_Plan_%28DCAF_ID_1376,_591,1433%29.aspx
|
|
No
|
SELECT
|
1611
|
|
Process Safety Review (eg HAZOP) Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Process Engineering
Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Safety_Review_%28e.g._HAZOP%29_Report_%28DCAF_ID_1611,_1413,_449,_1465%29.aspx
|
|
No
|
SELECT
|
141
|
|
Project Controls Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Front-End Development
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Controls_Plan_%28DCAF_ID_76,_141___1404%29.aspx
|
|
No
|
SELECT
|
580
|
|
Project HSSE and SP Activity Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Front-End Development
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_HSSE___SP_Activity_Plan_(DCAF_ID_1277,_55,_580,_586,_618).aspx
|
|
No
|
SELECT
|
1609
|
|
Project HSSE and SP MS
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1723
|
|
Project Insurance Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Finance Projects
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1358
|
|
Project Organisation incl. roles, resp., resourcing and onboarding plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Project Services
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
186
|
|
Project Schedule - Level 2
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Wells
Commercial Project Services
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1670
|
|
Proposal to Commence Neg. (PCN)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Commercial
Finance Projects Front-End Development Reservoir Engineering
Economics
|
https://eu001-sp.shell.com/sites/AAAAA7019/default.aspx
|
|
No
|
SELECT
|
1379
|
|
Reliability, Availability and Maintainability Report addressing sparing, RRM and turndown (preliminary)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Process Engineering Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Reliability,Availability_and_Maintainability_Report_addressing_sparing,RRM_and_turndown_%28preliminary%29_%28DCAF_ID_1379%29.aspx
|
|
No
|
SELECT
|
201
|
|
Risk Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Finance Projects Project Engineering
Project Services
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
1627
|
|
Schedule Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Front-End Development
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Schedule_Basis_report_%28DCAF_ID_1626,_1627,_1628%29.aspx
|
|
No
|
SELECT
|
652
|
|
Security Philosophy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Production Operations
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Security_Philosophy_%28DCAF_ID_652%29.aspx
|
|
No
|
SELECT
|
1375
|
|
Social Performance Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Production Operations Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Social_Performance_Plan_%28DCAF_ID_1375,_1385,_1625%29.aspx
|
|
No
|
SELECT
|
1710
|
|
Sourcing Package(s) Incl. Tender and Evaluation Plan(s) for Define/Long Lead Contract(s)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Contracting & Procurement
Quality Engineering
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Long_Lead_Contracts_%28Select_DCAF_ID_1710%29.aspx
|
|
No
|
SELECT
|
202
|
|
Stakeholder Engagement Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Front-End Development
Production Operations Project Engineering Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
236
|
|
Technical Standards Selection Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Information Management Maritime Process Engineering Project HSSE & SP Quality Engineering
Information Technology
|
https://ipms.shell.com/
|
|
No
|
SELECT
|
106
|
|
TQ Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Front-End Development Production Operations
Commercial Project Services
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1711
|
|
Asset DandR Plan
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Wells
|
|
|
No
|
DEFINE
|
235
|
|
Basic Design Package
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Process Engineering Production Chemistry Production Operations Production Technology Project HSSE & SP Quality Engineering Reservoir Engineering
Maritime
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1261
|
|
BDEP / Long Lead Contracts and Contract Management Documentation
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Contracting & Procurement
Finance Projects Information Management Quality Engineering
Project Engineering Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Long_Lead_Contracts___Contracts_Management_Documentation_%28Define_DCAF_ID_1261%29.aspx
|
|
No
|
DEFINE
|
589
|
|
BDEP / Long Lead Contracts Tender Reports
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Contracting & Procurement
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Long_Lead_Contracts_Tender_Reports_%28Define_DCAF_ID_589%29.aspx
|
|
No
|
DEFINE
|
396
|
|
CAPEX Cost Estimate - Type 3
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
414
|
|
Commissioning and Start-up (CSU) Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Project HSSE & SP
Production Technology Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Commissioning_and_Start-up_%28CSU%29_Plan_%28DCAF_ID_414%29.aspx
|
|
No
|
DEFINE
|
331
|
|
Constructability Report - Updated
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1615
|
|
Construction Contractors HSSE Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1506
|
|
Cost recovery framework
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Contracting & Procurement
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Cost_Recovery_Framework_%28DCAF_ID_1505,_1506,_1507%29.aspx
|
|
No
|
DEFINE
|
179
|
|
CP Execution Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Contracting & Procurement
Project Engineering Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/CP_Execution_Plan_%28Define_DCAF_ID_179%29.aspx
|
|
No
|
DEFINE
|
383
|
|
Design ALARP Demonstration Report (Design HSSE and SP Case)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Maritime Process Engineering Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Concept___Design_ALARP_demonstration_report_%28HSSE__SP_Case%29_%28DCAF_ID_180,_383___639%29.aspx
|
|
No
|
DEFINE
|
246
|
|
Design Class Detail
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations
Process Engineering
|
|
|
No
|
DEFINE
|
1613
|
|
Emergency Response Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Maritime Production Operations Project HSSE & SP
Logistics
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1403
|
|
Estimate Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Estimate_basis_report_%28DCAF_ID_1336,_1352,_1374,_1403___1419%29.aspx
|
|
No
|
DEFINE
|
1405
|
|
Flawless Project Delivery and Q Assurance Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Quality Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Flawless_Project_Delivery___Q_Assurance_Plan_%28DCAF_1405%29.aspx
|
|
No
|
DEFINE
|
251
|
|
GHG (Greenhouse Gas) and Energy Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/GHG_%28Greenhouse_Gas%29_and_Energy_Efficiency_Report_%28DCAF_ID_63,_676,_251,_655,_677%29.aspx
|
|
No
|
DEFINE
|
398
|
|
Group Investment Proposal
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Finance Projects Production Operations Project HSSE & SP Reservoir Engineering
Commercial Economics
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
245
|
|
Hazardous Area Classification Drawings
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Process Engineering
|
http://sww.wiki.shell.com/wiki/index.php/Hazardous_Area_Classification_%28DCAF_ID_245_%26_1271%29
|
|
No
|
DEFINE
|
1725
|
|
Health Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Health_Plan_%28DCAF_ID_1603,_1607,_1610,_1386,_1624%29.aspx
|
|
No
|
DEFINE
|
382
|
|
HSSE and SP Hazards and Effects Register
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Production Operations
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/HSSE___SP_Hazards_and_Effects_Register_%28DCAF_ID_1604,_57,_213,_382,_628%29.aspx
|
|
No
|
DEFINE
|
1618
|
|
HSSE and SP Premises
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1643
|
|
IM Scope of Work and Information Specification
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Management
Maintenance, Reliability & Turnarounds
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IM_Scope_of_Work_and_Information_Specification_%28DCAF_ID_Select__1646,_Define__1643,_Execute__1637%29.aspx
|
|
No
|
DEFINE
|
392
|
|
Impact Assessment
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Production Operations
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1721
|
|
Inspection Strategy including ECIA
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Quality Engineering
Maritime
|
|
|
No
|
DEFINE
|
1719
|
|
Insurance plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Finance Projects
|
|
|
No
|
DEFINE
|
406
|
|
Interface Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations
Contracting & Procurement
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
671
|
|
IT Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IT_plan_%28DCAF_ID_1265,_669,_671___672%29.aspx
|
|
No
|
DEFINE
|
1644
|
|
IT Scope of Work
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IT_Scope_of_Work_(DCAF_ID_1647,_1644,_1638).aspx
|
|
No
|
DEFINE
|
1645
|
|
IT Solution Architecture
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Information Management
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Solutions_Architecture_%28DCAF_ID_1645%29.aspx
|
|
No
|
DEFINE
|
355
|
|
Logistics and Infrastructure Project Execution Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Logistics
Wells
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Logistics_and_Infrastructure_Project_Execution_Plan_(DCAF_ID_355).aspx
|
|
No
|
DEFINE
|
1677
|
|
Operability and Maintainability Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operability_and_Maintainability_Report_(DCAF_1677)._DEFINE_phase.aspx
|
|
No
|
DEFINE
|
363
|
|
Operations and Maintenance Philosophy (updated)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Information Management Logistics
Information Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operations___Maintenance_Philosophy_(updated)_(DCAF_363).aspx
|
|
No
|
DEFINE
|
369
|
|
Operations Management System (OMS) including HSSE and SP-outline
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maritime Project HSSE & SP
Maintenance, Reliability & Turnarounds
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operations_Management_System_(OMS)_including_HSSE___SP-outline_(DCAF_369).aspx
|
|
No
|
DEFINE
|
354
|
|
Operations Readiness Management Plan (updated)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operations_Readiness_Management_Plan_%28update%29_%28DCAF_ID_354%29._DEFINE_phase.aspx
|
|
No
|
DEFINE
|
397
|
|
OPEX Estimate - Type 3
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Wells
Logistics Maintenance, Reliability & Turnarounds Process Engineering Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/OPEX_Estimate_-_Type_3_%28DCAF_397%29.aspx
|
|
No
|
DEFINE
|
1408
|
|
Owners Construction Management Plan and Resource Plan for Execute Phase
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Quality Engineering
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
590
|
|
Permits and Consents Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Permits_and_Consents_Assessment,_Strategy,_Plan_and_Submission_for_Permits_and_Consents_%28DCAF_ID_574,_150,_590,_1443%29.aspx
|
|
No
|
DEFINE
|
315
|
|
Pipeline Design Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Pipeline-Route-Survey-and-Pipeline-Design-Reports-(DCAF-ID-314,-315).aspx
|
|
No
|
DEFINE
|
314
|
|
Pipeline Route Survey Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Pipeline-Route-Survey-and-Pipeline-Design-Reports-(DCAF-ID-314,-315).aspx
|
|
No
|
DEFINE
|
1413
|
|
Process Safety Review (eg HAZOP) Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Process Engineering
Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Safety_Review_%28e.g._HAZOP%29_Report_%28DCAF_ID_1611,_1413,_449,_1465%29.aspx
|
|
No
|
DEFINE
|
1404
|
|
Project Controls Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Controls_Plan_%28DCAF_ID_76,_141___1404%29.aspx
|
|
No
|
DEFINE
|
586
|
|
Project HSSE and SP Activity Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_HSSE___SP_Activity_Plan_(DCAF_ID_1277,_55,_580,_586,_618).aspx
|
|
No
|
DEFINE
|
1612
|
|
Project HSSE and SP MS
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Production Operations
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
346
|
|
Project Organisation incl. roles, respons., resourcing and onboarding plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations
Contracting & Procurement Project HSSE & SP Project Services Quality Engineering
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1500
|
|
Project ownership, controls and authorisation framework
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Project Engineering
Contracting & Procurement Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Ownership,_Controls___Authorisation_Framework_%28DCAF_ID_1499,_1500,_1501%29.aspx
|
|
No
|
DEFINE
|
591
|
|
Project Quality Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Quality Engineering
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Preliminary_Project_Quality_Plan,_Project_Quality_Plan_and_Final_Project_Quality_Plan_%28DCAF_ID_1376,_591,1433%29.aspx
|
|
No
|
DEFINE
|
395
|
|
Project Schedule - Level 3
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Wells
Commercial Project Services
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
412
|
|
Project to Asset (P2A) Transfer Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Information Management
Information Technology Production Technology Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_to_Asset_%28P2A%29_Transfer_Plan_%28DCAF_412%29.aspx
|
|
No
|
DEFINE
|
1512
|
|
Project treasury application
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Treasury_application_%28DCAF_ID_1512,_1513%29.aspx
|
|
No
|
DEFINE
|
1523
|
|
Prospective Benchmarking Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Commercial Production Operations Project Services Quality Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Prospective_Benchmarking_Report_%28DCAF_ID_1523%29.aspx
|
|
No
|
DEFINE
|
332
|
|
Reliability, Availability and Maintainability Report addressing sparing, RRM and turndown (updated)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Process Engineering Production Operations
Contracting & Procurement
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Reliability,Availability_and_Maintainability_Report_addressing_sparing,RRM_and_turndown_%28updated%29_%28DCAF_ID_332%29.aspx
|
|
No
|
DEFINE
|
399
|
|
Risk Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Finance Projects Project HSSE & SP
Commercial Logistics Production Operations Project Services Quality Engineering
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1628
|
|
Schedule Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Schedule_Basis_report_(DCAF_ID_1626,_1627,_1628).aspx
|
|
No
|
DEFINE
|
334
|
|
Scope of Work for Execute Contracts
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Chemistry Production Operations
Logistics Maritime Project Services
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
391
|
|
Security Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Security_Plan_%28DCAF_ID_391%29.aspx
|
|
No
|
DEFINE
|
1385
|
|
Social Performance Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Social_Performance_Plan_%28DCAF_ID_1375,_1385,_1625%29.aspx
|
|
No
|
DEFINE
|
1524
|
|
Spare Parts Strategy
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Contracting & Procurement Maritime
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Spare_Parts_Strategy_%28DCAF_ID_1524%29.aspx
|
|
No
|
DEFINE
|
400
|
|
Stakeholder Engagement Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Commercial Contracting & Procurement
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Stakeholder_Engagement_Plan_%28DCAF_ID_8,_85,_202,_400,_467%29.aspx
|
|
No
|
DEFINE
|
1407
|
|
Updated TQ Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Commercial Production Operations Project Services
|
https://ipms.shell.com/
|
|
No
|
DEFINE
|
1508
|
|
Value of Work Done and Appraisal management procedure
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Value_Of_Work_Done___Appraisal_Management_procedure_%28DCAF_ID_1508,_1509%29.aspx
|
|
No
|
EXECUTE
|
463
|
|
CAPEX Cost Estimate - Type 4
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Wells
Project Services
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
1620
|
|
Construction Contractors HSSE Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
1507
|
|
Cost recovery framework
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Contracting & Procurement Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Cost_Recovery_Framework_%28DCAF_ID_1505,_1506,_1507%29.aspx
|
|
No
|
EXECUTE
|
440
|
|
CSU, Handover, Maintenance and Normal Operating Procedures
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Maritime
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/CSU,_Handover,_Maintenance_and_Normal_Operating_Procedures_(DCAF_440).aspx
|
|
No
|
EXECUTE
|
639
|
|
Design ALARP Demonstration Report (Design HSSE and SP Case)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Maritime Production Operations
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Concept___Design_ALARP_demonstration_report_%28HSSE__SP_Case%29_%28DCAF_ID_180,_383___639%29.aspx
|
|
No
|
EXECUTE
|
457
|
|
Emergency Response Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maritime Project HSSE & SP Wells
Logistics
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
1450
|
|
End of Well Report
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Geophysics Petrophysics / Geomechanics Production Chemistry Production Technology Reservoir Engineering Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/End_of_Well_Report_%28DCAF_ID_1558,_1559,_1560,_1561,1450,_227%29.aspx
|
|
No
|
EXECUTE
|
1419
|
|
Estimate Basis Report
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Services
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Estimate_basis_report_%28DCAF_ID_1336,_1352,_1374,_1403___1419%29.aspx
|
|
No
|
EXECUTE
|
1433
|
|
Final Project Quality Plan (inc FATs and licensor reviews)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Quality Engineering
Contracting & Procurement Maritime
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Preliminary_Project_Quality_Plan,_Project_Quality_Plan_and_Final_Project_Quality_Plan_%28DCAF_ID_1376,_591,1433%29.aspx
|
|
No
|
EXECUTE
|
1434
|
|
Flawless Project Delivery Plan - Update for construction phase
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Quality Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Flawless_Project_Delivery_Plan_-_Update_for_Construction_Phase_%28DCAF_1434%29.aspx
|
|
No
|
EXECUTE
|
655
|
|
GHG (Greenhouse Gas) and Energy Management Plan (Final)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Process Engineering
Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/GHG_%28Greenhouse_Gas%29_and_Energy_Efficiency_Report_%28DCAF_ID_63,_676,_251,_655,_677%29.aspx
|
|
No
|
EXECUTE
|
1217
|
|
Hazardous Area Class. Drawings - Final
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Process Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Chemicals_requirement_report_%28DCAF_ID_1272,_250,_1224%29.aspx
|
|
No
|
EXECUTE
|
1726
|
|
Health Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Health_Plan_%28DCAF_ID_1603,_1607,_1610,_1386,_1624%29.aspx
|
|
No
|
EXECUTE
|
628
|
|
HSSE and SP Hazards and Effects Register
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/HSSE___SP_Hazards_and_Effects_Register_%28DCAF_ID_1604,_57,_213,_382,_628%29.aspx
|
|
No
|
EXECUTE
|
1637
|
|
IM Scope of Work and Information Specification
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Management
Maintenance, Reliability & Turnarounds
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IM_Scope_of_Work_and_Information_Specification_%28DCAF_ID_Select__1646,_Define__1643,_Execute__1637%29.aspx
|
|
No
|
EXECUTE
|
631
|
|
Impact Assessment
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Production Operations
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
672
|
|
IT Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IT_plan_%28DCAF_ID_1265,_669,_671___672%29.aspx
|
|
No
|
EXECUTE
|
1638
|
|
IT Scope of Work (ITT Execution and Operations)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Information Technology
Maintenance, Reliability & Turnarounds
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/IT_Scope_of_Work_(DCAF_ID_1647,_1644,_1638).aspx
|
|
No
|
EXECUTE
|
475
|
|
Logistics and Infrastructure Transition and Operations Plans
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Logistics
Project HSSE & SP
Contracting & Procurement
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Logistics___Infrastructure_Transition_and_Operations_Plan_(DCAF_ID_475).aspx
|
|
No
|
EXECUTE
|
615
|
|
Operability and Maint. Report (review)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operability_and_Maintainability_Report_(review)_(DCAF_615).aspx
|
|
No
|
EXECUTE
|
610
|
|
Operations Readiness Mgt. Plan (final)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Information Management Production Technology
Information Technology Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Operations_Readiness_Management_Plan_%28final%29_%28DCAF_ID_610%29._EXECUTE_phase.aspx
|
|
No
|
EXECUTE
|
464
|
|
OPEX Estimate - Type 4
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Maintenance, Reliability & Turnarounds Wells
Logistics Process Engineering Production Technology
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/OPEX_Estimate_-_Type_4_%28DCAF_464%29.aspx
|
|
No
|
EXECUTE
|
449
|
|
Process Safety Review (eg HAZOP) Report -close-out
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Process Engineering Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Process_Safety_Review_%28e.g._HAZOP%29_Report_%28DCAF_ID_1611,_1413,_449,_1465%29.aspx
|
|
No
|
EXECUTE
|
618
|
|
Project HSSE and SP Activity Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_HSSE___SP_Activity_Plan_(DCAF_ID_1277,_55,_580,_586,_618).aspx
|
|
No
|
EXECUTE
|
1619
|
|
Project HSSE and SP MS
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Project HSSE & SP
Maintenance, Reliability & Turnarounds Production Operations Quality Engineering
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
1501
|
|
Project ownership, controls and authorisation framework
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Project Engineering
Contracting & Procurement Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Ownership,_Controls___Authorisation_Framework_%28DCAF_ID_1499,_1500,_1501%29.aspx
|
|
No
|
EXECUTE
|
476
|
|
Project to Asset (P2A) Transfer Plan (final)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Production Operations
Information Management Production Technology Project HSSE & SP
Information Technology Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_to_Asset_%28P2A%29_Transfer_Plan_-_Final_%28DCAF_476%29.aspx
|
|
No
|
EXECUTE
|
1513
|
|
Project treasury application
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Treasury_application_%28DCAF_ID_1512,_1513%29.aspx
|
|
No
|
EXECUTE
|
486
|
|
Rel., Avail.and Maint. Report addressing sparing, RRM and turndown (final)
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Maintenance, Reliability & Turnarounds
Process Engineering Production Operations
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Reliability,Availability_and_Maintainability_Report_addressing_sparing,RRM_and_turndown-_final_%28DCAF_ID_486%29.aspx
|
|
No
|
EXECUTE
|
466
|
|
Risk Management Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Finance Projects Production Operations
Commercial Contracting & Procurement Project HSSE & SP Project Services Quality Engineering
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
1622
|
|
Security Risk Assessment
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Project_Security_Risk_Assessment_%28DCAF_ID_1622%29.aspx
|
|
No
|
EXECUTE
|
1625
|
|
Social Performance Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project HSSE & SP
Project Engineering
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Social_Performance_Plan_%28DCAF_ID_1375,_1385,_1625%29.aspx
|
|
No
|
EXECUTE
|
467
|
|
Stakeholder Engagement Plan
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Production Operations Project HSSE & SP
Commercial Contracting & Procurement
|
https://ipms.shell.com/
|
|
No
|
EXECUTE
|
1538
|
|
Static Structural Model (Depth/Structural Framework Model)
|
NS
|
Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Geology
Geophysics
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Structural_Framework%29.aspx
|
|
No
|
EXECUTE
|
1443
|
|
Submission for Permits and Consents
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Project Engineering
Process Engineering Production Chemistry Production Operations Project HSSE & SP Wells
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Permits_and_Consents_Assessment,_Strategy,_Plan_and_Submission_for_Permits_and_Consents_%28DCAF_ID_574,_150,_590,_1443%29.aspx
|
|
No
|
EXECUTE
|
1509
|
|
Value of Work Done and Appraisal management procedure
|
NS
|
Downstream;Integrated gas;Upstream
|
Excluding
|
Brownfield
|
Finance Projects
Project Services
|
https://eu001-sp.shell.com/sites/AAAAB1732/Pages/Value_Of_Work_Done___Appraisal_Management_procedure_%28DCAF_ID_1508,_1509%29.aspx
|
|